Start your beamtime

Here is a short introduction to start the experiment. Please open the following three interfaces to view, move, control and scan the required (pseudo) motors in order to execute your experiment during the beamtime.

Samples handling

At the RIXS endstation in Veritas beamline, you can carry out experiments with solid, liquid and gas samples. Here is a brief introduction of the sample environment, sample handling and preparation (particularly solid state samples).

Solid state samples

Get to know the endstation chambers

As already mentioned in the previous section, the Veritas RIXS endsation has three chambers, for solid and gas samples, as labled in the figure:

  • Load Lock (LL) chamber

  • Upper chamber or transfer chamber. This chamber receives the sample plate(s) from LL chamber. This chamber also houses the sample rod (which is also the closed cycle He cryostat).

  • Q-chamber or the measurement chamber. It allows continuous motion of the scattering arm without breaking the vacuum.

../../_images/endstation.jpg

RIXS endstation chambers.

RIXS endstation chambers.

The solid samples can be in the form of powder (pelletized), single crystals or thin films. Here is a brief introduction of the steps you may follow to introduce your sample finally into the main chamber.

Here is a flowchart of the process that we usually follow.

../../_images/New_1.jpg

Solid state sample handling.

NOTE: If your sample is air sensitive, you can use the argon suitcase and mount it directly on the load lock. To avail this, you must use the glove box facility available in one of the chemistry labs.

Sample plate

We use Omicron flag-style sample plate and the sample is glued on it either using both-side copper tape (if you are not cleaving the sample) or some conductive epoxy (example: Epotek H21D conductive epoxy, or Epotek E4110 conductive epoxy). Currently we have stainless steel and copper sample plates, and if you need, we can ship a few plates to the your address. For this, the you must approach the beamline responsible atleast one month ahead of the scheduled beamtime.

The sample gluing on the sample plate must be done within one of the shaded regions depending on the choice of cryostat head during experiment. You may glue multiple samples in one sample plate (if the azimuth cryo-head is not used), however, it is recommended to follow the orientation as shown in the figure.

../../_images/sample_plate.jpg

Sample plate and sample gluing regions.

Load Lock

The load lock (LL) is attached to the upper chamber, and equipped with a linear transfer arm constituting of a sample bank to store four sample plates.

If your sample is air sensitive and cleaving may not be possible, please contact the beamline responsible and we will exchange the linear transfer system with an argon suitcase constituting of four sample plates bank. In this case, you, the user, may use Ar glove box available in one of the Chemistry labs at MAX IV to transfer samples into the samples plate bank of Ar suitcase. Purge the LL with Ar several times (5-6 times) before opening the suitcase valve, after which start the roughing pump followed by the turbo pump and wait till the pressure in LL is lower than 5 x 10^-7 mbar.

If you want to cleave the sample, you dont need to use the Ar suitcase. Introduce the sample plates from the LL door into the sample bank. After reaching appropriate pressure in the LL (lower than 5 x 10^-7 mbar), you may cleave with the transfer wobble stick.

How to Cleave ?

1. Top-post cleave Glue a post on the sample surface using conductive epoxy (example: Epotek H21D conductive epoxy, or Epotek E4110 conductive epoxy). It is recommended to use a post of similar surface area as that of the sample. Inside the LL, after reaching appropriate pressure, knock off the post using the transfer wobble stick to expose a clean sample surfece.

2. Tape cleave (mechanical exfoliation) You can also exfoliate the sample surface using tape (typically we use kaptone tape). See the figure.

Transfer sample to the sample rod in upper chamber

Now its time to transfer the sample plate(s) to the sample rod in the upper chamber (UC). Prior to transfer, the manipulator must be set to sample transfer positions in order to receive the sample plate. Let us know how to do this :

You need the following softwares to align the sample rod’s sample holder surface parallel to the sample plate:

Open these softwares

Prior to sample transfer and subsequent experiments lets open and get familiar with the following two control panels / softwares:

  1. QuickGUI

  2. Scangui

Sample transfer positions

The sample transfer will differ depending on the samplerod and environment currently in use. Please not the differences when indicated Please continue working on the list below.

Using the QuickGUI, Move manipulator to the following positions depending on the choice of the sample rod head:

Sample transfer positions for the low temperature head at 10 K:

Positions

Low temperature head

multi slot head

azimuth head

a_mp1_x

66.65 mm

a_mp1_y

374 mm

a_mp1_z

17.5 mm

a_mp1_yaw

2 deg (tight/loose), 357 deg (to insert / remove sample plate)

Transfer process: Follow the following steps to transfer the sample plate into the sample rod in the UC.

  1. Close the valve between Q chamber and UC.

  2. Check LL pressure is in the order of 10^-7 mbar.

  3. Open the valve between the LL and UC.

  4. Rotate the manipulator (a_mp1_yaw) to tight/loose position.

  5. Tight/un-tight the screw holding the sample plate.

  6. Remove if there is any sample in the sample rod and and park it in the LL sample garage.

  7. Rotate the manipulator (a_mp1_yaw) to sample insert position.

  8. Grab a new sample plate from LL garage.

  9. Transfer it to the sample rod in the UC.

  10. Rotate the manipulator (a_mp1_yaw) to tight/loose position.

  11. Tight the screw.

  12. Repeat the process between 5-11 if you have multiple samples.

  13. Retract the transfer wobble stick and close the valve between LL and UC.

  14. Open the valve between Q chamber and UC (safety feature: you cannot lower the manipulator if the valve is closed, yet its better to check and open the valve before lowering the manipulator).

  15. Lower the manipulator to experimental position.

  16. Now its time to find the samples. Go to “Finding samples” section.

Liquid samples

PumpingSchematicForLiquidjetSetup

How to start pumping

  1. confirm auto vent for larger TMP is disabled. if it is not, change the setting to disabled.

  2. Open angle valves (B) for inner chamber pumping. Wait for a minute.

  3. Open angle valves (A and C) for the inner differential pumping and the outer chamber pump.

  4. Start two TMPs for the inner differential pumping and the outer chamber

  5. Wait for the vacuum to recover

How to stop pumping

  1. Confirm valves to the beamline and emission spectrometer are closed. It is recommended to close 3 gate valves from the endstation main chamber. If filter valves were used, remove the filter( i.e. open the filter valve) just after closing the gate valves to prevent damage to the thin film windows.

  2. Close angle valve(A and C)  for outer chamer pumping.

  3. Close angle valve(B)  for innter chamber pump.

  4. Stop two TMPs for outer chamber pumping (and enable auto vent for larger TMP, if it is not enabled)

  5. Wait for the chamber will be vented with air.

Pumping_lines

Procedure to Cleaning cold trap

Note: The chamber is required to be in air pressure before starting.

  1. remove the N2 dewer at the lower side of the cold trap. It is required to tilt the drawer to remove it. User cryo glove for your safety.

  2. set the “pot” with water and a hot plate underneath the cold trap with the lift.

  3. if necessary, add liquid nitrogen to the solvent cold trap of the sample remover setup .

  4. Find the red line with a blank plug on the cold trap. Connect the red line to the sample remover setup which is prepared beside the M4 mirror of b branch.

SampleRemoveRedLine

  1. Start the small pump of the sample remover setup to remove liquid from the cold trap.

  2. Start heating pot with heter controller setting around 50deg

  3. Wait for the sample to melt and the sample comes out to the glass canister. If the glass canister becomes full; Stop the pump, exchange the glass canister, and continue pumping.

  4. When all the sample is removed from the cold trap. Stop heating of the pot, stop the small pump of the sample remover setup, and remove the pot and hot plate. Be aware that the hot plate might be still hot. Put a blank plug on the red line and seal it.

  5. Detach the glass canister of the sample remover. Store the chemical waste solutions in the canister, and dispose of them by following the rules related to chemical safety.

  6. now it is ready to start pumping of the chamber

Note: After cleaning of the cold trap, vacuum of the chamber will be around 1 mbar after start pumping initially, but it will become better after starting cooling the cold trap. The outer chamber should be around 2 to 6E-4 after starting cooling of the cold trap.

Gas samples

Finding samples

Now its time to expose your sample to x-ray photons. Prior to this, check from synoptic if we have beam on the slit, and all the valves are open. If the sample rod is still in the UC, make sure to open the valve between Q-chamber and UC.

We first start with a 2D spatial map of the sample (a_mp1_x vs. a_mp1_y), after setting a_mp1_yaw at normal incidence. From this point on, you are going to use the control and acquisition software named ‘Scangui’. Here is how we do it:

Mesh scan

This is a 2D mapping of your sample using appropriate beamline energy. In the first attempt, the beamline energy does not need to be exactly the resonance energy, rather, any energy close to the resonant energy will work to get the contrast. You need to open these two softwares: Scangui and Sampletracker

After loading the sample down to the main chamber (we call it Q-chamber), you first begin with the mesh scan. This is how you can setup the mesh scan in Scangui:

go to ‘MacroExecutor’ or ‘Sequencer’ tab –> find ‘mesh’ macro from the ‘Macro’ dropdown list –> add it –> at the bottom, select the values ‘a_mp1_x’ and ‘a_mp1_y’ under parameters ‘motor1’ and ‘motor2’, respectively –> give start and final motors positions, nr_interval (number of steps), and integ_time. Set bidirectional to ‘true’ or ‘false’.

Linescan

With the Scangui, you can along x or y while reading an absorption intensity

  1. Start the Scanguiand the quickgui

  2. From the quickgui: Write down current manipulator positions: a_mp1_x, a_mp1_y, a_mp1_z, and a_mp1_yaw

  3. In the quickgui, choose an appropriate beamline_energy for getting contrast when you are on the sample

  4. In the Scangui, select the measurement group “NEXAFS” (see details on how to change measurement group in the entry about the Scangui)

  5. In the Scangui, go to basic executor select a_mp1_x or a_mp1_y and scan around your starting guess

  6. In the Scangui, plot a_mp1_x towards the appropriate alba elektrometer signal

Calibrating the emission spectrometer

See the entry under RIXS client